वि.सं:
नेपाल संवत: ११४६ कछलागा अष्टमी - २३
| Name | Download |
|---|---|
| NBC 105_2020 Commentary_V1.2 | Click Here |
| NBC 208 ::SANITARY AND PLUMBING DESIGN REQUIREMENTS | Click Here |
| NBC 207 :: ELECTRICAL DESIGN REQUIREMENTS for (PUBLIC BUILDINGS) | Click Here |
| NBC 206:: 2024 ARCHITECTURAL DESIGN REQUIREMENTS | Click Here |
| NBC 205:: 2024 READY-TO-USE DETAILING GUIDELINE FOR LOW RISE REINFORCED CONCRETE BUILDINGS WITHOUT MASONRY INFILL | Click Here |
| NBC 204:: 2015 GUIDELINES FOR EARTHQUAKE RESISTANT BUILDING CONSTRUCTION EARTHEN BUILDING | Click Here |
| NBC 203:: 2015 GUIDELINES FOR EARTHQUAKE RESISTANT BUILDING CONSTRUCTION LOW STRENGTH MASONRY | Click Here |
| NBC 202:: 2015 GUIDELINES ON LOAD BEARING MASONRY | Click Here |
| NBC 201::MANDATORY RULES OF THUMB REINFORCED CONCRETE BUILDINGS WITH MASONRY INFILL | Click Here |
| NBC 114::CONSTRUCTION SAFETY | Click Here |
| NBC 113::ALUMINIUM | Click Here |
| NBC 112::TIMBER | Click Here |
| NBC 111::STEEL | Click Here |
| NBC 110::PLAIN AND REINFORCED CONCRETE | Click Here |
| NBC 109::MASONRY : UNREINFORCED | Click Here |
| NBC 108::SITE CONSIDERATION FOR SEISMIC HAZARDS | Click Here |
| NBC 107::PROVISIONAL RECOMMENDATION ON FIRE SAFET | Click Here |
| NBC 106::SNOW LOAD/td> | Click Here |
| NBC 105 ::SEISMIC DESIGN OF BUILDINGS IN NEPAL | Click Here |
| NBC 104::WIND LOAD | Click Here |
| NBC 103::OCCUPANCY LOAD (IMPOSED LOAD) | Click Here |